
Case Study
Long-Span Terrace Refurb
A detailed look at the scope, the challenges we solved and the final result.
Selected system
Single-ply membrane
Scope of work
Full-length flat roof strip, new warm-roof build-up and mechanically fixed single-ply across the entire terrace.
Challenging details
Long uninterrupted run with multiple penetrations and party-wall upstands demanding continuous weatherproofing.
Solution
Insulation laid to falls, membrane welded in long sheets with reinforced perimeter and party-wall details.
Finished result
One continuous watertight roof over the entire terrace, ready for decades of island weather.
